变风量空调系统全过程调适技术:联合运行调适方法

Whole process commissioning technology of VAV systems: Combined operation commissioning method

廖滟[1] 陈昭文[1] 魏峥[1] 牛利敏[1] 吴凌宇[1] 张世栋[1] 景雪梅[2]
[1]中国建筑科学研究院有限公司 [2]北京美瑞泰富置业有限公司

摘要:

针对空调专业与自控专业调适脱节造成的大量变风量空调系统的实际运行效果欠佳、不能实现变风量控制功能的现象,以实际项目为例,重点介绍了全过程调适技术中的联合运行调适方法,包括传感器准确性验证、执行器控制能力验证、系统控制逻辑优化及验证和运行效果验证。经过联合运行调适,项目最终实现变风量空调系统按负荷需求自动运行。

关键词:变风量空调系统,联合运行调适,传感器,执行器,控制逻辑

Abstract:

VAV control function cannot be realized due to the poor actual operation effect caused by the disconnection between HVAC and automatic control system. Based on an actual project, presents a whole process operation commissioning combination method for a VAV system, which including sensor accuracy validation, actuator control capability validation, system control logic optimization and operation effect validation. Through the combined operation commissioning, automatic operation of the VAV system finally can be realized according to the load demand.

Keywords:VAVairconditioningsystem,combinedoperationcommissioning,sensor,actuator,controllogic