暖通空调>期刊目次>2011年>第2期

轨道交通徐家汇换乘枢纽工程暖通设计难点分析

Difficulty analysis of HVAC system design of Xujiahui Underground Railway Center

黄丽君
上海市城市建设设计研究院

摘要:

徐家汇枢纽是上海三条轨道交通线换乘枢纽,工程规模大,建设难度高,协调烦琐。从暖通资源共享方案、机房布置、风管设置、与建筑的协调、分期实施、火灾控制等方面介绍了该工程的暖通空调设计,可供今后类似设计参考。

关键词:换乘枢纽,地下室改造,地铁车站,资源共享

Abstract:

This center is the junction station of three city railway lines, featuring in large scale, difficult design and cumbersome coordination between disciplines. Presents the HVAC design of the station from the aspects of the resource sharing plan, the equipment room arrangement, the air duct arrangement, the coordination with architectural style and building structure, the phased implementation, fire control, etc., providing reference for HVAC design in similar underground railway station.

Keywords:underground railway station center, reconstruction of basement, underground railway station, resource sharing

    你还没注册?或者没有登录?这篇期刊要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!