大型焊接车间通风方式模拟对比与实测验证

Simulation comparison and test verification of ventilation methods in large-scale welding workshops

张建飞 崔巍峰 赵超杰 乔西萍 杜旭
机械工业第六设计研究院有限公司

摘要:

 以某大型焊接车间为例,通过数值模拟方法,分析了焊接烟尘在大空间的扩散机理,发现车间上空存在烟尘滞留区。提出了3种通风方式,通过对比分析,得出最佳通风方式为置换送风口+诱导射流风机+机械排风机,并进行了现场实测验证,结果显示此通风方式能满足工程需要与规范要求。

关键词:焊接车间,烟尘污染,通风,气流组织,置换送风口,诱导射流风机,机械排风机

Abstract:

Taking a large-scale welding workshop as an example, analyses the diffusion mechanism of welding fume in large-scale space by numerical simulation, and finds the existence of fume retention area above the workshop. Proposes three ventilation methods. Through comparation and analysis, concludes that the optimized ventilation mode is displacement air inlet plus induced jet fan and mechanical exhaust fan. The results of field measurement show that the ventilation method can meet the engineering needs and the code specifications.

Keywords:welding workshop, fume pollution, ventilation, air distribution, displacement air inlet, induced jet fan, mechanical exhaust fan

    你还没注册?或者没有登录?这篇期刊要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!