核电现场暖通问题处理流程优化

HVAC field problem handling process optimization in nuclear power projects

陆松 胡北 赵磊
中国核电工程有限公司

摘要:

以核岛暖通系统为例,依据某核电工程现场实际工作经验,并结合项目程序文件要求,总结出核电现场问题实际处理流程。对流程中不同的阶段进行了分析,针对不利于现场问题处理的环节,提出了流程优化的建议,形成了优化的问题解决方案,为在建核电项目现场问题的高效处理提供参考。

关键词:核岛,现场问题,流程,澄清要求,现场变更要求

Abstract:

Takes the HVAC system of a nuclear island as an example, according to the on-site working experience and quality procedure documents in a nuclear power station, summarizes the actual field problems handling process. Analyses the different stages of field working, proposes an optimization for process link to the disadvantage of on-site problem solving, and forms the optimal problem solutions, which can provide a reference for high efficient on-site problem treatment of nuclear power projects under construction.

Keywords:nuclearisland,on-siteproblem,process,clarificationrequirement,fieldchangerequirement