暖通空调>期刊目次>2018年>第5期

全寿命周期成本分析在火力发电厂厂前区供冷设计中的应用

Life cycle cost analysis of cooling system scheme for auxiliary building area of power plant

黄 挺[1] 曹园树[1] 孙文龙[1] 王 琳[2]
[1]中国能源建设集团广东省电力设计研究院有限公司 [2]湖南大学

摘要:

基于全寿命周期成本的分析,对广东某火力发电厂厂前区供冷的综合初投资、运行费用、维护费用和全寿命周期成本进行对比分析。结合各方案施工的难易程度、设计的复杂程度及运维能力等方面,综合考虑为广东某火力发电厂厂前区选择适合的供冷系统冷源设计方案。

关键词:火力发电厂,厂前区,冷源系统,全寿命周期成本,供冷系统

Abstract:

Based on the life cycle cost (LCC) analysis, compares and analyses the initial investment, operating costs, maintenance costs and life cycle costs of cooling system for an auxiliary building area of a power plant in Guangdong. Considering the difficulty in construction, complexity of design, operation and maintenance ability of each scheme, selects a proper cold source of cooling system for the auxiliary building area of the power plant in Guangdong.

Keywords:power plant, auxiliary building area, cold source system, life cycle cost (LCC), cooling system