某核电厂制冷机调试经验

Commissioning experiences of refrigerating machines in a nuclear power plant

吕胡人
上海核工程研究设计院

摘要:

详细介绍了某核电厂建造调试过程中发生的核级制冷机损坏的故障,并深入分析了故障产生的原因。通过总结经验,提出了核电厂建造调试过程的注意要点,为类似项目提供参考。

关键词:核电厂冷水系统调试低负荷工况压缩机液击

Abstract:

Presents the fault of the refrigerating machine occurred during the commissioning process of a nuclear power project, and analyses the causes of the fault. By summarizing the experiences, puts forward the key points in the construction and commissioning of nuclear power plants, providing the references for similar projects.

Keywords:nuclear power plant, chilled water system, commissioning, low load condition, compressor, liquid hammer