摘要:

针对冷却塔降温效果较差问题,采取了重新码放填料、调整风机转速比、增加风机叶片数量、加宽叶片直径等改进措施。多次的试运行结果表明改进措施是可行的。

关键词:空调 冷却水系统 冷却塔 改进措施

Abstract:

For solving the problem of insufficient temperature drop, adopts some improvement measures including relocating filling materials, adjusting the rotational speed rate of the fans, increasing the fan blade quantity and using wider fan blades. The trial operation results show that the measures are feasible.

Keywords:air conditioning, cooling water system, cooling tower, improvement measure