大型集中空调水系统调试浅析——以京沪高速铁路上海虹桥站为例
Commissioning of water system of large central air conditioning systems: A case study of Shanghai Hongqiao Station of Beijing-Shanghai high-speed railway
摘要:
总结了大型集中空调水系统调试过程中需要注意和解决的几个问题,对传统大管径空调水系统冲洗方法提出了质疑,对调试过程中的水流量分配提出了自己的观点,希望为大型集中空调水系统的调试提供一种新的思路和方法。
关键词:空调水系统,冲洗,水流量分配,保温
Abstract:
Summarizes some problems to be considered and solved in the commissioning process of a large central air conditioning water system. Questions the conventional flushing methods for air conditioning water systems with large diameter pipe. Puts forward some viewpoints on the distribution of water flow in commissioning process, expecting to provide another idea and method for commissioning large central air conditioning water systems.
Keywords:air conditioning water system, flushing, water flow distribution, heat preservation