暖通空调>期刊目次>2022年>第10期

BIM机电正向设计研究——以武汉东湖·阿丽拉酒店为例

Study on BIM forward design for mechanical electrical plumbing—An example of Wuhan East Lake·Alila Hotel

吕中一 王 伟 张银安 沈大宇 宛 超 宋 涛
中南建筑设计院有限公司

摘要:

以武汉东湖·阿丽拉酒店项目为例,介绍了基于Revit平台的BIM机电正向设计的具体实践、项目级的BIM标准及协同模式。列举了正向设计中的具体应用与创新,并针对实际应用中BIM数据、设计效率及机电系统图出图等问题进行了总结。提出了新的思考,为后续的BIM机电设计提供参考。

关键词:BIM;机电;正向设计;酒店;可视化;协同;管线综合

Abstract:

Taking the Wuhan East Lake·Alila Hotel project as an example, the specific practice of BIM forward design for mechanical electrical plumbing (MEP) based on Revit platform, project-level BIM standard and collaboration mode are presented. The specific applications and innovations in the forward design are listed, and the problems of BIM data, design efficiency and MEP system diagram output in practical application are summarized. This paper proposes new thinking, which provides a reference for subsequent BIM MEP design.

Keywords:BIM; mechanical electrical plumbing(MEP); forward design; hotel; visualization; synergy; pipeline synthesis

    你还没注册?或者没有登录?这篇期刊要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!