Design improvement and application of air conditioning system for main control room in a nuclear power plant

Chen Hongjun

2021.01.20

Analyses the reason of low temperature and high humidity phenomenon in the main control room of a nuclear power plant in summer. Puts forward an improvement scheme. By optimizing the system design configuration and taking lots of improvement measures, the temperature and humidity in the main control room can be controlled to meet the required environmental conditions and to ensure the comfort of the operators.