Research on whole process management method of air conditioning system in public buildings (4): System commissioning in operation period based on energy management platform By Hao Zhigang, Wei Qingpen

Hao Zhigang, Wei Qingpeng, Deng Jiewen and Zhang Hui

2019.04.17

Focusing on the operation commissioning stage in the whole process management of energy conservation of air conditioning system in public buildings, taking a large-scale commercial complex in Southwest China as an example, presents the application of energy management system as a main tool to excavate the energy saving potential of air conditioning system in an all-round way under the premise of guaranteeing indoor environment comfort. In order to promote the energy saving optimization of air conditioning system, studies in depth the operation commissioning of the system in different stages and different periods, and proposes the specific operation strategies.