Reasonable application of ground thermal response test
Zhang Zhipeng, Ma Hongquan, Shen Lingling, Su Youwei and Zhou Yingkun
2014.12.22
Combining with relevant codes, points out that four key parameters should be obtained from ground thermal response test before designing ground-source heat pump system. Analyses the method of processing test data, design and calculation way of ground heat exchanger and the match of design parameters. Taking a typical thermal response test as an example, expounds the key issues mentioned.