Energy saving reform for energy station of a complex project in Beijing

Song Hongsheng

2017.05.17

Presents the cold and heat sources of air conditioning system of an energy station. Based on the energy consumption data of the centralized energy station operating in 2015, analyses the matching features between designed equipment capacity and actual load using typical daily load, evaluates the design schemes, in order to guide the equipment capacity optimization for similar projects design. Performs the operation analysis of the direct-fired chiller system from four aspects of annual electricity consumption, building energy consumption, equipment efficiency, temperature difference between supply and return water, to improve energy saving, and presents the reform suggestions.