Problem analysis and reformation of an atmospheric pressure boiler room

Shi Kai, Wen Yajing and Zheng Hongfei

2017.05.04

Analyses the problems of the atmospheric pressure hot water boiler and heating system in a certain mine. Combined with the actual situation, puts forward a reform measure of changing the single point constant pressure system to the high and low pressure zoning system. Through the reforming, the problems have been effectively solved, and it can meet the heating demand of the mine.