Typical problem analysis on HVAC system commissioning of five star hotels

Liu Hui, Cao Yong and Wei Jingshu

2017.03.13

Analyses the typical design and installation problems of HVAC system in the commissioning process of several five star hotels. Points out the common issues of the commissioning of automatic control, air balance, valves in the water system, static balance, interior decorating and mechanical systems. Presents two specific issues of hood exhaust in kitchen and two-pipe water system.