Discussion on HVAC design for reactor building in high temperature reactor plant module(HTRPM) demoplan
Liu Siguang and Gao Xu
2016.11.15
The structure design of containment vessel and technology system of HTRPM is different from pressurized water reactor (PWR). Presents the characteristics of heating, ventilation and air conditioning systems for HTRPM, analyses the difference of HVAC system design between HTRPM and PWR, and expounds the key point of HVAC design in HTRPM.