HVAC system design and operation of Tenio Green Design Center

Liu Bing, He Qing and Chen Xinli

2016.09.14

Presents the HVAC system design of an office building, states the selection of the occupancy density and in room rate, electrical equipment power density, lighting power density and switching rate, radiant floor cooling capacity calculation and checking, and the outdoor air system design of the conference room and energy storage tank capacity selection and design. Compares and analyses the actual operation effect, presents the use of natural cold source, analyses the problems in the process of running and commissioning, and puts forward the solutions.