Air conditioning system design for a matching building of data centers in Beijing

Jiang Haiyuan, Song Xiaochun, Jiang Hong, Guo Yu, Man Le and Li Lei

2016.03.14

Presents the general situation of the project, and expounds the design of ice storage cold source system, distributed secondary pump heat source system, air conditioning terminal water system and ventilation system. Summarizes the countermeasures according to the actual project issues, such as room area using vertical system or horizontal system, whether the outdoor air systems of office area setting heat recovery, the height of the chimney and the impact of the second phase of construction. Expounds the points for attention in the design of kitchen, the design of gas and the bidding documents writing, and summarizes the actual cost index of the cold and heat source system.