Air conditioning design for Zhuoyue Century Center
Ding Ruixing, Liu Hong
2014.12.17
Presents briefly the design of the project from the following aspects: the central refrigerating station, pressure zoning of the air conditioning water system, air conditioning of office standard layer, application of wheel heat recovery technology to the super high-rise office building, reusing of air conditioning condensate, rationality of cooling tower placement, etc. In the light of commissioning practice, shares the authors’ reflections on the project design.