Groundsource heat pump system in phase 2 of Jiuhua Hotel project
Chen Fengjun, Feng Tingting
2015.02.09
Describes the design, construction, commissioning and followup testing of the GSHP system in Jiuhua Hotel. Presents backgrounds for using the hybrid system, points out the necessity of measuring the ground thermal parameter and simulating the fluid temperature, and illustrates the importance of keeping thermal balance underground. Analyses testing results of this project.