Design and operating experience of the National Stadium
Hu Jianli
2015.02.09
Summaries some experiences in the design, testing and operating stages. Presents the annual air conditioning load dynamic simulation, thermal environment and wind environment simulation with CFD, loop pipeline design of the air conditioning water system, supporting design of the temporary facilities, and the fire performance-based design and evaluation.