HVAC design for the Top Electronics City

Xu Haisong, Jin Jian, Li Wenyun, Li Jingsha

2015.02.04

Presents the air conditioning system and smoke exhaust system design of this project, applies the primary air fan coil system and secondary pump water system in the Top Electronics City. Summarizes the selection of air conditioning and water system, the determination of smoke exhaust system and cooling load of HVAC design for large space commercial buildings.