Installation quality control of low temperature hot water floor radiant heating systems
Xing Xiuqiang, Li Xiaonan, Song Xiaodong
2015.02.04
Takes control measures in selecting contractors, materials to be used in site, installation process, system regulation and commissioning, etc. Based on full process control of system installation and statistic analysis of quality control, finds out main problems of installation quality. Finds main factors affecting installation quality through site inspection and sample test, and then puts forward rectifying measures for quality problems.