Feasibility analysis of chilled water thermal storage air conditioning systems in phase 2 of Pudong International Airport project

Liu Chuanju, Hong Lijuan

2015.02.03

Based on the technological analysis and economical comparison, concludes that applying the chilled water thermal storage air conditioning system to this kind of projects with sufficient area, intermittent operating and large peak/offpeak load difference of air conditioning can level the electric load, reduce the installed capacity and decrease the operating expense.