Commissioning of water system of large central air conditioning systems: A case study of Shanghai Hongqiao Station of Beijing-Shanghai high-speed railway

Liu Sencheng and Luan Houxiang

2015.01.12

Summarizes some problems to be considered and solved in the commissioning process of a large central air conditioning water system. Questions the conventional flushing methods for air conditioning water systems with large diameter pipe. Puts forward some viewpoints on the distribution of water flow in commissioning process, expecting to provide another idea and method for commissioning large central air conditioning water systems.