Retrofit design of ventilation and dehumidification system for an underground project
Liu Guiting, Huo Shanglong
2014.12.30
Presents the retrofit scheme. Selects preliminarily the dehumidifying equipment based on the moisture load, and checks the actual moisture removal and air parameter inside the cave storage. Provides the machine room layout, operating mode of the system, automatic control and noise reduction and vibration isolation.