Design and analysis of cooling tower cooling system for an office building in Yantai

Jiang Hong

2021.05.20

Taking an office building in Yantai as an example, presents the cooling tower cooling system design in detail. Analyses the selection of room temperature in inner rooms, the calculation of the highest chilled water temperature, the comparison of equipment configuration of the load side and the cold source side, the calculation of the cooling tower operation time, and the energy saving and economic comparison of seven feasible schemes. Reasonably selects the switching temperature, cooling time, operating water temperature of the cooling tower cooling system to make full use of the cooling function of the cooling tower.